Offloading grid approvals and negotiations
Posted - 20 July 2021
It is mandatory in Australia to get DNSP grid approvals for your solar PV system connected to their network. DNSP will request lot of documents depending on the existing network infrastructure.
For the system size above 30 kVAC DNSP may ask for variety of documents which includes but not limited for the following
- Site Layouts
- AC SLDs
- Protection Schematics
- Protection Grading studies
- Commissioning plans
- Functionality statements’
- Details for the DER
- Applicants’ information etc
ecologiq provides extensive support to your solar projects which includes complete grid application and negotiation with your DNSP. All the requirements from various DNSP can be fulfilled through our critically designed streamlined process.