ecologiq was engaged by the client to support with detailed feasibility assessments including structural engineering analysis on Victoria university St. Albans campus across 5 buildings x 99 kW systems.
First phase of our engagement was to conduct an audit for the site and review the structural and electrical infrastructure. Second phase included detailed reporting including recommended design for STC systems for the site.
Key services included site and infrastructure assessment, feasibility assessment, detailed design, creation of tender documentation and evaluation support.
Location: VIC
Project Owner: Victoria University
Industry Sectors: Commercial
Contact us